Helpful & Friendly AdviceCall: 01275 400456

Small Stainless Steel Wash Basin

Product Code: WBSN

Stainless steel small hand wash basin 500 x 350 x 180mm
£205.20 inc VAT£171.00 ex VAT

updown
£205.20 inc VAT£171.00 ex VAT
add to compare

This one-piece hand wash basin is manufactured from stainless steel with all exposed surfaces polished to a satin finish, mounted on a satin finish stainless steel apron support.

The hand wash basins are supplied with two pre-drilled tap holes, and are supplied as standard with a c32mm flush grated waste fitting, no overflow, no plug.

Suitable where full size wash basins are required to ensure adequate hand washing facilities are available.

Delivery

Typically 1 to 2 working days

Tech Spec

Material: Stainless steel - 304 grade
Width: 500mm
Front to Back: 350mm
Depth: 180mm
Satin polished apron support
Two tap holes
Complete with 32mm flush grated waste

Extras

Taps
Time-flow taps
Lever-operated mixer taps
Infrared basin taps
We have a full selection of taps available to suit your requirements

Traps
McAlpine-brand plastic 32mm bottle trap
Brass 38mm bottle trap, chrome-plated with chrome flange and waste pipe

Related products

As an alternative we supply different size wash basins, or if required we also supply inset wash basins.
Trough sinks are becoming a popular choice in school wash rooms and can be supplied in stainless steel or solid surface material.

**All pictures shown are for illustration purpose only and may be subject to change without notice. Actual product may vary due to product enhancement.
All dimensions shown are for guidance only and may be subject to change or alteration without notice. All items manufactured or purchased separately from a third party to fit our products should be checked against the actual dimensions of the physical product before purchase. We will not be liable for third party costs and consequential loss associated with the items not fitting third party components.**

wash-basin-dimensions

Delivery

From stock usually 1 to 2 working days.

Delivery Times

Delivery times stated on the website are indicative of the average time it takes to deliver each product. All delivery times are based on working days and do not include weekends or Bank Holidays.
For remote areas sometimes deliveries may take a little longer than specified.
We will contact you if there are any known delays in the delivery times on your order.

Delivery Method

All orders are despatched by the most suitable and economic method.
If you have ordered several items they may arrive separately to make sure they are delivered by the quickest and most appropriate method, and to guarantee you get the best prices.
Please note our carriers do not offer fixed time slots, and due to time constraints are not able to telephone before delivering. 

related products